How a job runs

No mystery, no drift, no chasing us for answers.

01

Walk-through

We measure the space, read the surfaces, and tell you what actually needs doing — not what fills a quote.

02

Written scope

Line-item proposal: products, sheens, coats, prep, timeline, and price. No allowances hiding a surprise.

03

Protect and prep

Masking, covering, sanding, caulking, priming. The day the color goes on is the easy day.

04

Finish and inspect

Final coats, full clean-out, and a joint inspection with a written punch list closed before we leave.